COMPX374

Software Engineering Industry Project

2025

15

300

B Trimester

Hamilton, Tauranga

COMPX202 or COMPX242.

COMPX375

Students work in small groups to engineer a prototype for a medium-sized software project. Following established software engineering design principles, they elicit requirements and document specifications, design the system architecture and user interface, carry out documentation preparation, implementation, and plan for maintenance. To this end, the paper introduces design methodologies in Software Engineering Management, such as project initiation, planning and closure, and Software Engineering Methods, such as agile, formal, heuristic and prototyping. Additionally, this paper includes a component on professional interaction skills within the workplace and CV preparation.

Teaching Periods and Locations

25B (HAM)
Paper outline
B Trimester :
07 Jul 2025 - 02 Nov 2025
Hamilton On-campus 100% internal assessment
25B (TGA)
Paper outline
B Trimester :
07 Jul 2025 - 02 Nov 2025
Tauranga On-campus 100% internal assessment

If your paper outline is not linked below, try the previous year's version of this paper.

Indicative Fees

  • You will be sent an enrolment agreement which will confirm your fees. Tuition fees shown are indicative only and may change. There are additional fees and charges related to enrolment - please see the Table of Fees and Charges for more information.

Domestic
International
25B (HAM) $1,036
25B (TGA) $1,036

You will be sent an enrolment agreement which will confirm your fees. Tuition fees shown are indicative only and may change. There are additional fees and charges related to enrolment - please see the Table of Fees and Charges for more information.

25B (HAM) $4,834
25B (TGA) $4,834

You will be sent an enrolment agreement which will confirm your fees. Tuition fees shown are indicative only and may change. There are additional fees and charges related to enrolment - please see the Table of Fees and Charges for more information.

Available subjects

  • Paper details current as of 6 Aug 2024 01:41am
  • Indicative fees current as of 18 Nov 2024 01:20am